Podium Landscape

Guides · Garden year

Your garden in July

6 of the 32 species in our plant database ask something of you in July. Everything else in the garden can be left alone, which is half of what a calendar is for.


Most monthly garden advice is written for nobody's garden. It says "prune shrubs" in a month when pruning half of them costs you next year's flowers. What follows is the July row of our own Garden year: each job attached to the plant that asks for it, from the same database the Dossier is built from.

July, plant by plant

PlantWhat July asks of it
Sweet cherry (Prunus avium)Prune the cherry now, in dry weather, straight after the fruit.
Cotton lavender (Santolina chamaecyparissus)Remove the yellow flowers if you want the silver to stay clean.
Japanese forest grass (Hakonechloa macra)Keep it damp; it browns at the tips the moment it dries out.
Yarrow (Achillea 'Terracotta')Deadhead to the next bud for a second flowering in September.
Hardy geranium (Geranium × oxonianum 'Claridge Druce')Shear the whole plant to 10 cm after flowering; it refoliates in three weeks.
Blackcurrant (Ribes nigrum 'Andega')Pick, then cut out the stems you picked from.

Every job here comes from that species' own entry in our database — the same rows that build the Garden year in a Dossier.

The whole-garden job

What not to do

Next month: August. A Dossier includes all twelve rows, written on your plants — and on the first of each month we email you that month's three jobs.


Read next

Your own space

Describe your space, see a Preview.

Six fields, about two minutes, and you get the July row of your own Garden year, on your plants. The Preview costs nothing — no account, no email, no card.

The full Dossier — plan, plant palette, budget, works order and the twelve months of your garden year — is 99 €, once, if you want it.